WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING
WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING Bandung | 20 – 22 Mei 2014 | Rp 8.900.000 Bandung | 25 – 27 November 2014 | Rp 8.900.000 COURSE OUTLINE Oil Field Production System Natural Production Systems Production System With Artificial Lift Gas Lift (GL) Introduction Continue and Intermittent Gas […]
Connect
Connect with us on the following social media platforms.