Tag: Gas Lift

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING
By January 22, 2014 0 Comments Read More →

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING Bandung | 20 – 22 Mei 2014 | Rp 8.900.000 Bandung | 25 – 27 November 2014 | Rp 8.900.000       COURSE OUTLINE Oil Field Production System   Natural Production Systems   Production System With Artificial Lift Gas Lift (GL)  Introduction Continue and Intermittent Gas […]

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM Bandung | 18 – 21 December 2013 | Rp 7.750.000/person Jadwal 2014 Bandung | 27 – 30 January 2014 | Rp 8.500.000/person Bandung | 24 – 27 February 2014 | Rp 8.500.000/person Bandung | 24 – 27 March 2014 | Rp 8.500.000/person Bandung | 21 – 24 […]

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING
By March 7, 2013 0 Comments Read More →

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING Hotel Horison, Bandung | 28 – 30 Agustus  2013 | IDR  9.750.000,- /Participant  Hotel Horison, Bandung | 12 – 14 November 2013 | IDR  9.750.000,- /Participant    SASARAN BELAJAR : Setelah menyelesaikan kursus ini diharapkan peserta dapat : Memahami prinsip-prinsip dasar perhitungan reservoir minyak bumi yang berhubungan dengan penggunaan gas-lift, […]

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR HYDROCARBON PRODUCTION SYSTEM
By March 7, 2013 0 Comments Read More →

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR HYDROCARBON PRODUCTION SYSTEM

PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR HYDROCARBON PRODUCTION SYSTEM Hotel grand serela,  Bandung | 20 – 22  Maret 2013 | IDR  9.000.000 Hotel grand serela,  Bandung | 9 – 11 April  2013  | IDR  9.000.000     SASARAN BELAJAR : Setelah menyelesaikan kursus ini diharapkan peserta dapat :   Memahami prinsip-prinsip dasar perhitungan reservoir minyak bumi yang berhubungan […]

ARTIFICIAL LIFT WELLS OPTIMIZATION
By November 6, 2012 0 Comments Read More →

ARTIFICIAL LIFT WELLS OPTIMIZATION

ARTIFICIAL LIFT (CONTINUOUS GAS LIFT, SUCKER ROD PUMP, AND ELECTRICAL SUBMERSIBLE PUMP) WELLS OPTIMIZATION Bandung | December 03-05, 2012  | Investasi : Data Menyusul   Today, petroleum getting harder to find and the rate of oil production In Indonesia continues to decline due to not finding new oil wells, old oil wells production in Indonesia also declining. To […]

Gas Lift And Production Optimization (PASTI JALAN)

Gas Lift And Production Optimization (PASTI JALAN)

Gas Lift And Production Optimization Ibis Malioboro Hotel,Yogyakarta | May 3-7, 2010 | Rp.8.250.000,- COURSE OBJECTIVE The objective of this course is to provide comprehensive coverage of Gas Lift design in Production Optimization. The latest technology multi phase flow and inflow well performance is covered. Continuous flow and intermittent lift including valve mechanics are emphasized. Theory and applications […]